BigW Consortium Gitlab

  1. 02 Sep, 2014 1 commit
  2. 08 Nov, 2013 1 commit
    • Fix minor errors/annoyances in email templates · 57ad81a9
      Drew Blessing authored
      There was some funny syntax in merge request email templates. There was a ! before
      the merge request number when there probably should be a #. This may be some carry over
      from markdown but should not be in email templates.  There were also some capitalization
      discrepancies among the subject lines. For those OCD people out there I standardized the
      capitalization. :)
  3. 30 Aug, 2013 1 commit
  4. 18 Jul, 2013 1 commit
    • Merge Request on forked projects · 3d7194f0
      Izaak Alpert authored
      The good:
      
       - You can do a merge request for a forked commit and it will merge properly (i.e. it does work).
       - Push events take into account merge requests on forked projects
       - Tests around merge_actions now present, spinach, and other rspec tests
       - Satellites now clean themselves up rather then recreate
      
      The questionable:
      
       - Events only know about target projects
       - Project's merge requests only hold on to MR's where they are the target
       - All operations performed in the satellite
      
      The bad:
      
        -  Duplication between project's repositories and satellites (e.g. commits_between)
      
      (for reference: http://feedback.gitlab.com/forums/176466-general/suggestions/3456722-merge-requests-between-projects-repos)
      
      Fixes:
      
      Make test repos/satellites only create when needed
      -Spinach/Rspec now only initialize test directory, and setup stubs (things that are relatively cheap)
      -project_with_code, source_project_with_code, and target_project_with_code now create/destroy their repos individually
      -fixed remote removal
      -How to merge renders properly
      -Update emails to show project/branches
      -Edit MR doesn't set target branch
      -Fix some failures on editing/creating merge requests, added a test
      -Added back a test around merge request observer
      -Clean up project_transfer_spec, Remove duplicate enable/disable observers
      -Ensure satellite lock files are cleaned up, Attempted to add some testing around these as well
      -Signifant speed ups for tests
      -Update formatting ordering in notes_on_merge_requests
      -Remove wiki schema update
      Fixes for search/search results
      -Search results was using by_project for a list of projects, updated this to use in_projects
      -updated search results to reference the correct (target) project
      -udpated search results to print both sides of the merge request
      
      Change-Id: I19407990a0950945cc95d62089cbcc6262dab1a8
  5. 01 Jul, 2013 1 commit
  6. 28 Feb, 2013 1 commit